The main part of the civil construction project of Myanmar Bond PV project are three land projects,Source:综合部办公室 The main part of the civil construction project of Myanmar Bond PV project are three land projects, namely Belin30MWac ground PV project, Myogyi20MWac ground PV project and Shwebo30MWac ground PV project. Belin30MW Ground photovoltaic power station project, located in Kyaukshi City, Mandalay Province, the site center is located in 96 14 '26.698 ", latitude 21 37' 51.174", the center of the site is about 110m, about 42km away from Mandalay capital of Mandalay city. Belin30MW The total installed capacity of the ground photovoltaic power station project is 43.5456MWdc on the DC side, The AC-side installed capacity is 31.25MWac, The project consists of six photovoltaic squares, Among them, 4 photovoltaic squares are each equipped with a capacity of 6250 kVA centralized inverter booster integrated machine equipped with 16,128540 Wp photovoltaic modules, Two photovoltaic squares are equipped with a 3125 kVA centralized inverter booster, Install 8,064540 Wp photovoltaic modules, Overall installation of 46250 kVA and 23125 kVA centralized inverter booster machines, Install 80,640540 Wp photovoltaic modules, Each photovoltaic array is boosted to 33kV, Access to the 33kV bus of the project switching station through 2 return collector lines, Access to the system substation ——BelinPowerPlant via the switch station. Figure 1 Belin30MW Geographical location map of the switching station Figure 2 Belin30MW Layout plan of the switching station of the ground photovoltaic power station project Figure 3 Belin30MW General layout of PV site of Ground PV Power Station Project South Shan State Myogyi20MW ground photovoltaic power station project is located in Yean Town, Denu Autonomous Region, Dongzhi City, Shan State. The center of the site is located in east longitude 96 22 '09.67 ", latitude 21 30' 43.63". The altitude of the center of the site is about 220m, and it is about 105km away from Dongzhi City, the capital of Shan State. The total installed capacity of Myogyi20MW ground photovoltaic power station project in South Shan State is the DC side installed capacity of 30.48192MWdc, The AC-side installed capacity is 21.875MWac, The project consists of four photovoltaic squares, Each of the three photovoltaic squares are equipped with one 6250 kVA centralized inverter booster machine, Installation of 16,128540 Wp photovoltaic modules, One photovoltaic square array is equipped with a capacity of 3125 kVA centralized inverter booster machine, Install 8,064540 Wp photovoltaic modules, Overall installation of 36250 kVA and 13125 kVA centralized inverter booster machine, Install 56,448540 Wp photovoltaic modules, Each photovoltaic array is boosted to 33kV, Access to the 33kV bus of the project switching station through 2 return collector lines, Access to the power grid system ——MyogyiPowerPlant through the switching station. Figure 4. Location map of Myogyi20MW Ground PV Power Station in South Shan State Fig. 5 Layout plan of Myogyi20MW ground photovoltaic power station in South Shan State Fig. 6 General layout of Myogyi20MW Ground PV Power Station in South Shan State Shing Shwebo [30MW] ground photovoltaic power station project, located in Ruibo County, Shiing Province, the center of the site is located in east longitude 95 43 '43.260 ", 22 36' 54.575", the altitude of the site is about 130m, about 71km from the straight line of Shing, the capital of Shing. The total installed capacity of the Shwebo30MW ground photovoltaic power station project is 43.5456MWdc on the DC side, The AC-side installed capacity is 31.25MWac, The project consists of six photovoltaic squares, Each of the four photovoltaic squares are equipped with one centralized inverter with a capacity of 6250kW, Installation of 16,128540 Wp photovoltaic modules, Two photovoltaic squares are equipped with a capacity of 3125kW centralized inverter booster machine, Install 8,064540 Wp photovoltaic modules, Overall installed capacity of 46250kW and 23125kW centralized inverter booster integrated machine, Install 80,640540 Wp photovoltaic modules, Each photovoltaic array is boosted to 33kV, Access to the 33kV bus of the project switching station through 2 return collector lines, Access to the system substation ——ShweboPowerPlant via the switch station. Figure 7 Geographical location diagram of the Shwebo30MW ground photovoltaic power station engineering switching station Figure 8. Layout of Shwebo30MW ground photovoltaic power station project Figure 9 General layout of Shwebo30MW ground PV power station 3. landform 1、Mandalay Belin30MW ground PHOTOVOLTAIC power station project, the project covers a total area of about 49.04hm2, mainly for photovoltaic field, access road, switch station, etc., is located in Kyaukshi City, Mandalay Province, the center of the site is located in east longitude 96 14 '26.698 ", latitude 21 37' 51.174", the altitude of the site is about 110m, about 42km away from Mandalay, the capital of Mandalay. The project site is located in the plain area, the terrain within the site is relatively flat, the surface is mostly cultivated land, wasteland, a small number of shrubs. The site geological stability is good, which meets the topographic and geological conditions of photovoltaic power station construction. 2、South Shan State Myogyi20MW ground PHOTOVOLTAIC power station project, the project covers a total area of about 46.06hm2, mainly for photovoltaic field, access road, switch station, etc., is located in Yean Town, Denu Autonomous Region, Dongzhi City, Shan State, the center of the site is located in east longitude 96 22 '09.67 ", 2 N 130' 43.63", the altitude of the site is about 220m, about 105km away from Dongzhi City, the capital of Shan State. The site is located in a valley, with high terrain on both sides and low terrain in the middle, but the terrain is flat, and the surface is mainly cultivated land and a small amount of low arbor vegetation. The construction site is relatively open, and the site has good geological stability and convenient transportation, which can meet the construction conditions of the power station. 3、Shaling Shwebo30MW ground PHOTOVOLTAIC power station project, the project covers a total area of 56.1377hm2, mainly for photovoltaic field, access road, switch station area, etc., located in Ruibo County, The Province, the site center is located in east longitude 95 43 '43.260 ", north latitude 22 36' 54.575", the altitude of the site center is about 130m, the capital of the city is about a straight line distance of 71km. The project site is located in the hilly area, the terrain within the site is relatively flat, the surface is mostly cultivated land, wasteland, a small number of shrubs. The site geological stability is good, which meets the topographic and geological conditions of photovoltaic power station construction. 4. Natural climatic conditions 1、Mandalay Belin30MW ground photovoltaic power station climate consists of a variety of, the eastern plateau for the temperate humid climate, the southernmost tropical Sahara climate, the rest of the tropical initial climate. The average temperature of the hottest months in the plain area is about 31℃, and the highest temperature in the hottest months at noon can reach more than 44℃. The eastern plateau has more rainfall and less rainfall in the plains. 2、The Myogyi20MW station in South Shan State is located in the eastern part of Myanmar. The climate is divided into three seasons, summer, autumn and winter. In summer, from March to June, the average temperature is from 21℃ to 27℃, and only zhalong County of Mengmai City has a high temperature of between 37℃ and 40℃. Autumn from June to September, and winter from October to December, the temperature drops to 4℃ to 15℃, if the high mountain area temperature will drop to about-1℃. 3、Shinging Shwebo30MW ground photovoltaic power station is located in the northern mountainous area of Shinging province, with poor light resources conditions, and the south is rich in light resources, showing a trend of gradually increasing from north to south. 5. Hydrological conditions 1、The groundwater types of the proposed Mandalay Belin30MW are bedrock fissure water and Quaternary pore diving. Bedrock fissure water mainly occurs in the bedrock joint fissure, and pore water mainly occurs in the pores of quaternary loose deposits. According to the analysis of the collected data, the groundwater depth in the site is large. 2、The groundwater types of the proposed Myogyi20MW surface PV power station in South Shan State are bedrock fissure water and Quaternary pore diving.bedrock fissure water mainly occurs in the bedrock joint fissure, and pore water mainly occurs in the pores of quaternary loose deposits. According to the collected data analysis, the groundwater depth in the site is large. 3、The groundwater type of the proposed site of Shwebo30MW ground photovoltaic power station is the upper stagnant water and pore diving in the covered layer. The upper stagnant water distribution is not continuous, only in relatively low places with little water quantity, which is greatly affected by precipitation; pore diving is deep. 6.Transportation 1、The Mandalay Belin30MW ground PHOTOVOLTAIC power station project mainly adopts highway traffic, which can enter the engineering site from the highway system through the approach road, and the project is used by mud and gravel road to organize the traffic. The length of the maintenance road of the site is 2.6km, and the length of the approach road is about 0.6km. 2、The site of Myogyi20MW surface PV power station in South Shan State is located about 12km northeast of Thanywa and 5km north of Myogyi in West Shan State. The south side of the site is connected by the current road and the highway, which can be used as the connecting road of the approach road. Scheme of the Project: Mandalay City-Yangon-MandalayHwy-Sintega-Yangon -MandalayHwy-Kyaukshi-Yangon-MandalayHwy-When Haminbo-current highway-Thanywa-current highway-Myogyi-current road-site, the total highway mileage is about 85km. The internal traffic of the project is organized by mud-bound gravel road. The length of the field maintenance road is 2.2km, and the length of the approach road is about 6.8km. 3、The external traffic of Shwebo30MW ground photovoltaic power station project mainly adopts highway traffic, which can enter the university from the expressway system through the engineering site through the approach road. The internal traffic of the project is organized by mud and gravel road, the length of the field maintenance road is 1.7km, and the length of the approach road is about 1.1km. |